|
Re: Foundation repair wording
Terry wrote:
"I had a 1982 Brick veneer house yesterday that had the foundation repaired about 3 months ago. 14 piers installed. Recently sheetrock has been repaired, and painted."
Maybe I missed something but isn't possible that these repaired dywall cracks are the result of the damage prior to the "recently" (3 months ago) repaired foundation that were "recently" patched up after the foundation repairs were completed? And perhaps the mortar cracks were not repaired after the foundation work?
Now if these are all cracks that occurred after the repair I can see the possibilty of it being a problem.
Just food for thought.
Eric
|