View Single Post
  #14 (permalink)  
Old 07-29-2007, 08:50 AM
Jerry Peck Jerry Peck is online now
Member
 
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 7,635
Re: FPE Stab-Lok Panel and Aluminum Wire
Quote:
Originally Posted by Chip Nai View Post
Did you advise that the FPE panel be changed-out to a known reliable panel,
I would change the wording of that from "to a know reliable panel" to "from a known problematic panel to a new panel'.

I would hate to say "known reliable" than have the replacement panel be defective and cause problems.
__________________
Jerry Peck, Construction / Litigation Consultant
Construction Litigation Consultants, LLC ( www.ConstructionLitigationConsultants.com )

Last edited by Jerry Peck : 07-29-2007 at 08:55 AM.
Reply With Quote