Originally Posted by
Tim Moreira
What I was thinking was that if a permit was pulled and it was going to be inspected, then the AHJ would want it up to today's code.
Not only that, but any replaced equipment *is required*, permit or not, to be installed in accordance with the code in existence at the time the replacement equipment is installed.