Originally Posted by
Brandon Whitmore
Will you point me to the requirement that says that you can not have the CPVC pipe within 6" of the draft hood-- I would appreciate it.
The 6" clearance required for the draft hood - 6" clearance to combustible material.
Type B gas vent is double wall and has a 1" clearance, Type A (I think it's called) is single wall and requires 6" clearance.
Bob Harper would have the specifics on that.