Thread
:
vertical pipe on relief line
View Single Post
#
12
(
permalink
)
04-18-2007, 07:48 PM
Jerry Peck
Member
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 7,760
Re: vertical pipe on relief line
The only problem with the CPVC for the hot or cold would be if that was not electric, but it is.
The CPVC would, should, be 6" from the draft hood.
Even poly bute was only 12" from a heat source like the draft hood.
__________________
Jerry Peck, Construction / Litigation Consultant
Construction Litigation Consultants, LLC (
www.ConstructionLitigationConsultants.com
)
Jerry Peck
View Public Profile
Send a private message to Jerry Peck
Visit Jerry Peck's homepage!
Find all posts by Jerry Peck