|
Re: Detaching facade
The 25,000 was for missing flashing between addition and main house. Apparently the problem has existed for some time. The R.E., who seems really nice, and her office, have been pulled into the suit. The second was in Glenview, 2 yr $1.2m - stairstep cracks over the O.H. door running up into the second floor. Corner of the 2nd floor over the center of the O.H. door - no steel beam, just wood truss over the door. No squash blocks at the basement TJI's - ceilings all drywalled. Ouch! I don't know who the inspectors were but they have a problem.
__________________
Eric Barker
Moraine Woods Consulting, Inc.
Barrington, IL
|