View Single Post
  #1 (permalink)  
Old 05-11-2008, 12:12 PM
Aaron Miller
 
Posts: n/a
Sla-On-Grade Curing/Loading
I've lost my ACI reference to the amount of time that should transpire between placement of the concrete in a slab-on-grade foundation and loading or framing the struture on it. Any hints?

Thanks,

Aaron
Reply With Quote