View Single Post
  #1 (permalink)  
Old 05-11-2008, 11:12 AM
Aaron Miller Aaron Miller is offline
Senior Member
 
Join Date: Mar 2007
Location: Nowhere, USA
Posts: 828
Sla-On-Grade Curing/Loading
I've lost my ACI reference to the amount of time that should transpire between placement of the concrete in a slab-on-grade foundation and loading or framing the struture on it. Any hints?

Thanks,

Aaron
Reply With Quote
Home inspection