|
Re: Sla-On-Grade Curing/Loading
Bruce,
No, don't remember the address, but, as I recall, it was in the SW section (which was not as big back then as it is now - that was 30 years ago).
That was at about the same time that a company in Texas (Dallas?) built a house in a mall/convention center as a promotion, raffled off the house, then took it down and re-constructed it on another lot. I believe it was 2 days to build, up for 5 days, 2 days to take it down, and another 2 days to put it back together. Not real sure of the time I have down for those, other than I remember for sure that it was only up for 5 days in the mall/convention center.
|