View Single Post
  #12 (permalink)  
Old 06-10-2008, 06:40 PM
Jerry Peck Jerry Peck is offline
Member
 
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 7,720
Re: What were they thinking?
Charlie,

It may have been a permitted job, and that ramp added later.

Regarding Michael's "I presume they must have installed that elbow and vertical tube because they did not have a plug." ... the city likely 'required' that "vent" for the auxiliary drain pan ... not that it needs one, but, I've actually seen municipal inspectors require the same thing.
__________________
Jerry Peck, Construction / Litigation Consultant
Construction Litigation Consultants, LLC ( www.ConstructionLitigationConsultants.com )
Reply With Quote