Originally Posted by
RANDY NICHOLAS
I HAVE DONE SEVERAL PHASE INSPECTIONS. PHASE #1: I WANT TO LOOK AT THE FOUNDATION PRIOR TO BEING POURED TO ENSUE THE PLUMBING SUPPLY LINES ARE PROTECTED FROM CONTACT WITH THE CONCRETE. THE CHEMICALS IN THE CEMENT IN THE CONCRETE WILL, IN TIME, CAUSE THE COPPER LINES TO FAIL, CAUSING A "SLAB LEAK". PHASE #2: INSPECT THE FRAMING PRIOR TO THE INSTALLATION OF THE DRYWALL FOR PROPER HEADERS, JOIST HANGERS, CLEARANCE OF ELECTRICAL WIRING & PLUMBING LINES FROM THE FACE OF THE FRAMING STUDS (NAILS PUNCTURING THE SAID LINES). PHASE #3: FINAL INSPECTION. MY FEES ARE $100.00 PER TRIP (PHASE #1 & #2) AND $200.00 FINAL INSPECTION.