mathew stouffer
06-09-2009, 06:57 AM
This looks like a Monday or Friday installation. Is an addtional Knock out required for these cables.
Thanks
Mat
Jerry Peck
06-09-2009, 07:04 AM
You betcha.
You got the one over at the left edge of the photo, right?
mathew stouffer
06-09-2009, 07:27 AM
Yep the one with 7 cables.
Powered by vBulletin® Version 4.2.0 Copyright © 2025 vBulletin Solutions, Inc. All rights reserved.