Dylan Shoop
07-06-2009, 07:38 AM
Two year old house. It appears the form board moved when the slab was poured. The brick is flush with slab at the back of the house and the ledge gets wider towards the front. About 2-3 inches. I've never seen this before and not sure how to report it and if this could be a potential problem later on. No evidence of any movement.