PDA

View Full Version : opinions please



wayne soper
07-03-2013, 11:54 AM
For the use of pex as backup flow preventer extension, and heat rated plastic heating pipe for tpr extension. thanks

Rick Cantrell
07-03-2013, 01:04 PM
I do not understand "backup flow preventer extension".

wayne soper
07-03-2013, 06:14 PM
oops, sorry Rick, Backflow preventer. On a boiler. This boiler had PEX instead of copper pipe. And heating supply lines(plastic) on the tpr valve.By the way, Happy 4th to you and yours!!

Billy Stephens
07-03-2013, 07:07 PM
oops, sorry Rick, Backflow preventer. On a boiler. This boiler had PEX instead of copper pipe. And heating supply lines(plastic) on the tpr valve.By the way, Happy 4th to you and yours!!

Good info on previous thread here http://www.inspectionnews.net/home_inspection/heating-ventilation-air-conditioning-hvac-home-inspection-commercial-inspection/31997-cross-linked-polyethylene-hot-water-line-temperature-rating.html

Keep it between the ditches Do-Da !:p