Joseph P. Hagarty
07-04-2008, 09:33 AM
Rear Deck
- Ledger board attachment is lag screws into OSB.
- Lag screws are counter sunkinto the ledger.
- Ledger attaches over the vinyl siiding without flashing. Water staining present on the OSB at the interior.
- Center beam is nailed together without support.
- Fasteners are corroded at the joist hangers.
- Poor framing of the stairway
- Loose handrails with 6 inch spacing of balusters.
- Ledger board attachment is lag screws into OSB.
- Lag screws are counter sunkinto the ledger.
- Ledger attaches over the vinyl siiding without flashing. Water staining present on the OSB at the interior.
- Center beam is nailed together without support.
- Fasteners are corroded at the joist hangers.
- Poor framing of the stairway
- Loose handrails with 6 inch spacing of balusters.