Any reporting system that allows editing and rearranging of systems will work.
NC reports have to have a summary starting after the cover page in the same order as the NC SOP's. No upgrade items are to be in the summary.
A safety issue that exists due to an existing component having a problem can be in the summary. ie. an existing GFCI that does not trip is a summary item.
Each writeup will need the word Repair: or Investigate: at the start of each writeup.
The report body also has to be in the same order as the SOP and be numbered the same as the SOP.
Here is the link for the report compliance checklist:
http://www.ncdoi.com/OSFM/Engineerin...eWorksheet.pdf