Results 1 to 2 of 2
  1. #1
    Join Date
    Dec 2009
    Location
    Florida
    Posts
    553

    Default Number of Spares in New Service Installation

    I can't seem to find the reference, as I am in the process of moving to FL, but can anyone cite the code requirement for the number of spares in a new service installation. I think that it was a percentage, but can't find it. If you can include the code reference it would be great. Thanks.

    Crawl Space Creeper

  2. #2
    Join Date
    Aug 2008
    Location
    Maryland
    Posts
    1,970

    Default Re: Number of Spares in New Service Installation

    The NEC does not require any spares or space for additional circuits.

    All answers based on unamended National Electrical codes.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •