Re: Ground Wire
Are you sure its not a bonding jumper??
If it is a ground I believe its required to be attached to the supply within 5ft upon entering the structure.
Most of the time the bonding of the piping (water & gas) is done at the water heater.
Oh and as far as usting stranded Al, I am unsure. However, I dont see what could be a problem...