InspectionNews - Home Inspection



Registration is FREE!... and will get rid of this top message

Welcome to InspectionNews.net.

You are currently viewing InspectionNews as a guest which gives you limited access to view some discussions but none of the pictures.

There are over 9,970 inspectors who have already joined. By joining InspectionNews you will be able to see the pictures, post new topics or reply to others, communicate privately with other members, respond to polls, upload content and access many other special features.

Registration is FREE for you because the sponsors pay your way. Please visit the sponsors often and let them know that you found them on InspectionNews!

Registration is FREE, fast and easy so please, join InspectionNews today!

Why join InspectionNews? Read the Testimonials

Looking for Education? We recommend Casey, O'Malley and Associates
Home and Commercial Inspection Education

If you have any problems with the registration process or your account login, please contact us.

Reply
 
LinkBack Thread Tools Search this Thread
  #1 (permalink)  
Old 02-14-2008, 03:16 PM
Michael Thomas's Avatar
Michael Thomas Michael Thomas is offline
Member
 
Join Date: Mar 2007
Location: Chicago, IL
Posts: 1,690
Seperate service to outbuilding serves circuits in main building with own service ...
New to me:

Apartment building has service, with load-side panels for each apartment.

Detached garage has separate service (different service drop from the same pole).

Per owner, common area circuits in apartment building are served by power from garage (!).

Can you do this?

If so, does it require a load side panel or other disconnect means in the main structure?

I understand the rules for a circuit from the service at a dwelling to a garage.

And I think I understand the rules for multiple services to a single structure.

But circuits from a building with one service to a building with another service?

For starters, how do you deal with the difference in ground potential?

Oh, and to make things even more fun: panel in the garage was obstructed, and I could not access, and I could not verify grounding method at either service.

I know the advice that’s coming: defer to an electrician…

But inquiring minds want to know….
__________________
Michael Thomas
Paragon Property Services Inc., Chicago IL
http://paragoninspects.com
Reply With Quote
IC Home Inspection Report Writing
  #2 (permalink)  
Old 02-14-2008, 06:05 PM
Jerry Peck's Avatar
Jerry Peck Jerry Peck is offline
Member
 
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 14,293
Re: Separate service to outbuilding serves circuits in main building with own service
From the 2008 NEC (with no changes from the 2005 NEC). (underlining and bold are mine)
- 230.2 Number of Services.
- - A building or other structure served shall be supplied by only one service unless permitted in 230.2(A) through (D). For the purpose of 230.40, Exception No. 2 only, underground sets of conductors, 1/0 AWG and larger, running to the same location and connected together at their supply end but not connected together at their load end shall be considered to be supplying one service. (Jerry's note: This last sentence does not apply, so it can be ignored.)
- - - (A) Special Conditions. Additional services shall be permitted to supply the following: (Jerry's note: None of the following 6 Special Conditions apply.)
- - - - (1) Fire pumps
- - - - (2) Emergency systems
- - - - (3) Legally required standby systems
- - - - (4) Optional standby systems
- - - - (5) Parallel power production systems
- - - - (6) Systems designed for connection to multiple sources of supply for the purpose of enhanced reliability
- - - (B) Special Occupancies. By special permission, additional services shall be permitted for either of the following: (Jerry's note: None of the following 2 Special Occupancies apply.)
- - - - (1) Multiple-occupancy buildings where there is no available space for service equipment accessible to all occupants
- - - - (2) A single building or other structure sufficiently large to make two or more services necessary
- - - (C) Capacity Requirements. Additional services shall be permitted under any of the following: (Jerry's note: See (3), even though there is no "capacity requirement" or need, it does say "By special permission", and the AHJ 'can give' that 'special permission' even though this is for "capacity requirements".)
- - - - (1) Where the capacity requirements are in excess of 2000 amperes at a supply voltage of 600 volts or less
- - - - (2) Where the load requirements of a single-phase installation are greater than the serving agency normally supplies through one service
- - - - (3) By special permission
- - - (D) Different Characteristics. Additional services shall be permitted for different voltages, frequencies, or phases, or for different uses, such as for different rate schedules. (Jerry's note: This does not apply.)
- - - (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37.

Regardless, those would be two (or more) services for one building or structure, not 'just running some circuits from one building to another'.

If not done "(3) By special permission ", then it is not allowed, and, if done "(3) By special permission ", even though for a different reason than allowed for by special permission, the AHJ may have (not likely though) allowed this "intentionally". I say "intentionally" because the AHJ probably did a plan review and 'just missed it', approving it "unintentionally", or, maybe it was changed from what was approved.

Either way, yeah, get a licensed electrical contractor to 'recommend appropriate repairs' and then consult with the local AHJ asking them about this ... they might 'just not know about it' and they could cause that condition to be corrected or they could accept it as it was built, either way makes it legal (correct or not) for the buyer and their in$urance company.
__________________
Jerry Peck, Construction / Litigation Consultant
Construction Litigation Consultants, LLC ( www.ConstructionLitigationConsultants.com )
www.AskCodeMan.com

Last edited by Jerry Peck : 02-15-2008 at 06:00 AM. Reason: change speelin' of in$urance
Reply With Quote
  #3 (permalink)  
Old 02-14-2008, 08:26 PM
Michael Thomas's Avatar
Michael Thomas Michael Thomas is offline
Member
 
Join Date: Mar 2007
Location: Chicago, IL
Posts: 1,690
Re: Seperate service to outbuilding serves circuits in main building with own service
Thanks as always for your quick reply.
__________________
Michael Thomas
Paragon Property Services Inc., Chicago IL
http://paragoninspects.com
Reply With Quote
  #4 (permalink)  
Old 02-17-2008, 07:44 AM
Jeff Remas Jeff Remas is offline
Member
 
Join Date: Mar 2007
Location: Northeastern Pennsylvania
Posts: 339
Re: Seperate service to outbuilding serves circuits in main building with own service
Great post Jerry. Long time no see.
__________________
Jeff Remas
www.PAinspector.com My posts are not my own and forced by the inner demons inside me without any thought or validity. Do not believe me.
Reply With Quote
Home inspection - The Cost Of Business.
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Main Service Entrance Panel Tom Payne Electrical Systems: Home Inspection and Commercial Inspection 4 09-17-2007 06:29 PM
A/C Service Disconnect Chris Skoczylas Heating, Ventilation, Air Conditioning (HVAC): Home Inspection and Commercial Inspection 19 08-27-2007 12:19 PM
Service conduit bonding at service equipment Michael Thomas Electrical Systems: Home Inspection and Commercial Inspection 0 08-07-2007 06:59 AM
Main service panel? Mark Muehleisen Electrical Systems: Home Inspection and Commercial Inspection 1 06-05-2007 01:09 PM
Welcome From F.I.R.E. Service Dale W. Feb Introductions By New Members 0 04-04-2007 06:22 PM

Alabama | Alaska | Arizona | Atlanta | Aurora | Austin | Baltimore | Boston | California | Cambridge | Cape Coral | Chandler | Charlotte | Chicago | Cincinnati | Clarksville | Cleveland | Colorado | Columbus | Connecticut | Dallas | Delaware | Denver | Detroit | Durham | El Paso | Eugene | Florida | Fort Worth | Fresno | Georgia | Gilbert | Hawaii | Henderson | Houston | Huntsville | Idaho | Illinois | Indiana | Indianapolis | Irvine | Jacksonville | Joliet | Kansas City | Knoxville | Lancaster | Las Vegas | Los Angeles | Louisiana | Louisville | Maine | Maryland | Massachusetts | Memphis | Mesa | Miami | Michigan | Milwaukee | Minneapolis | Minnesota | Miramar | Mississippi | Missouri | Montana | Nashville | Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota | Oakland | Ohio | Oklahoma | Omaha | Ontario | Orange | Oregon | Orlando | Pennsylvania | Philadelphia | Phoenix | Pittsburgh | Plano | Portland | Port StLucie | Raleigh | Rhode Island | Roseville | Sacramento | Salem | San Antonio | San Diego | San Francisco | San Jose | Scottsdale | Seattle | Sioux falls | South Carolina | South Dakota | St Louis | Tampa | Tennessee | Texas | Thornton | Toledo | Tucson | Tulsa | Utah | Vancouver | Vermont | Virginia | West Virginia | Wichita | Wisconsin | Wyoming | Cost To Repair

All times are GMT -7. The time now is 04:51 AM.


Design by Vjacheslav Trushkin.
Powered by vBulletin® Version 3.6.5
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.0.0 RC8
vB.Sponsors
All Rights Reserved. Hann Tech Marketing Link / InspectionNews.com / InspectionNews.net - No part of InspectionNews.net may be reproduced in any way, or by any means, without the prior written permission of InspectionNews.net. Use of any index or listing Software for the purpose of constructing a mailing list, creating promotional materials or producing a printed or electronic catalog of any kind is expressly forbidden without the prior written permission of InspectionNews.net - All text, graphics and design on InspectionNews.net is copyright by Hann Tech Marketing Links.
Ad Management by RedTyger