InspectionNews - Home Inspection



Registration is FREE!... and will get rid of this top message

Welcome to InspectionNews.net.

You are currently viewing InspectionNews as a guest which gives you limited access to view some discussions but none of the pictures.

There are over 9,970 inspectors who have already joined. By joining InspectionNews you will be able to see the pictures, post new topics or reply to others, communicate privately with other members, respond to polls, upload content and access many other special features.

Registration is FREE for you because the sponsors pay your way. Please visit the sponsors often and let them know that you found them on InspectionNews!

Registration is FREE, fast and easy so please, join InspectionNews today!

Why join InspectionNews? Read the Testimonials

Looking for Education? We recommend Casey, O'Malley and Associates
Home and Commercial Inspection Education

If you have any problems with the registration process or your account login, please contact us.

Reply
 
LinkBack Thread Tools Search this Thread
  #1 (permalink)  
Old 08-14-2008, 07:47 AM
Christopher Kovac Christopher Kovac is offline
Member
 
Join Date: Sep 2007
Location: Binghamton
Posts: 8
Main panel powered directly through breaker?
Hi Everyone,

Ran into something I had never seen before in a 2-family apartment I was inspecting yesterday. The main service for the house was 100 amp copper that entered two clipped utility panels in conduit above the main panels for each apartment. (see picture) The main panel for the second floor (see second picture) appears to be powered by the 50 amp breaker as opposed to the main lug in the upper left. I have enough other issues in the main panel for the first floor to call for an electrician, but I was hoping for some feedback on this...

Thanks in Advance,
Chris
Attached Images
File Type: jpg overview.jpg (130.7 KB, 139 views)
File Type: jpg main panel.jpg (135.7 KB, 140 views)
Reply With Quote
FREA Home Inspector Insurance
  #2 (permalink)  
Old 08-14-2008, 11:14 AM
Jerry Peck's Avatar
Jerry Peck Jerry Peck is offline
Member
 
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 14,293
Re: Main panel powered directly through breaker?
What your photo is showing is that the black conductor re-identified with "YELLOW" phase tape is the neutral conductor, which should have been re-identified with "white" phase tape. That is one problem, albeit a minor problem.

The other black conductor, which is not re-identified, is the hot phase conductor ... "one single" hot phase conductor ... which indicates that the upstairs unit is only fed with a 120 volt system, not a 120 volt / 240 volt system. Hopefully, there are no 240 volt appliances up there, I see the gas meters, so the water heater, range, and clothes dryer would all be gas (I hope), and the furnace would be gas (I hope), that leaves ... no ac, unless there are plug-in 120v window or through-the-wall units. This 'could be' another problem, but might not be.

The back-fed breaker acting as the main needs to be secured down so it cannot be removed easily or accidentally. That is another problem.

What astounds me, though is that there *are only two (2) circuits* for the upstairs unit. EVERYTHING is operating on those two circuits! That is another problem as you should have two circuits for the kitchen small appliances, and that leaves no circuits for the other outlets.

Also, I don't see a ground bond strap or screw to bond the neutral to ground. That is another problem. Which raises the question: is that enclosure/panelboard even rated to be used as "Service Equipment". If so, it would state so on the label, typically something like 'Suitable for use as Service Equipment'.

Then, of course, there are the other small things shown in the photo.

Then there is that cloth covered wire which looks 'silver' or 'aluminum' but which is likely "tinned copper" - "tinned copper" was used with rubber insulated conductors to keep the copper and rubber insulation from reacting chemically with each other. At this point in time, that rubber insulation is likely dried out, brittle, and of little use. Meaning that the upstairs unit may need a complete new wiring. You will notice that the bottom circuit is newer, with thermoplastic insulation, so ... does that mean the upstairs apartment only had ONE CIRCUIT?

I would recommend having a licensed and competent electrical contractor do a load calculation on the upstairs apartment, re-wiring and adding circuits as necessary. That is your best bet with what is shown in those photos.
__________________
Jerry Peck, Construction / Litigation Consultant
Construction Litigation Consultants, LLC ( www.ConstructionLitigationConsultants.com )
www.AskCodeMan.com

Last edited by Jerry Peck : 08-15-2008 at 11:23 AM. Reason: spellin'
Reply With Quote
  #3 (permalink)  
Old 08-14-2008, 04:02 PM
Dom D'Agostino Dom D'Agostino is online now
Member
 
Join Date: Mar 2007
Location: Longwood, FL
Posts: 415
Re: Main panel powered directly through breaker?
Isn't Binghamton one of those cities where many homes are converted to "multi-family" dwellings and apartments on the cheap (read: improper and unsafe) to cater to the college crowd?
Reply With Quote
  #4 (permalink)  
Old 08-15-2008, 10:16 AM
Corn Walker Corn Walker is offline
Member
 
Join Date: Apr 2008
Location: Western Massachusetts
Posts: 134
Re: Main panel powered directly through breaker?
Quote:
Originally Posted by Jerry Peck View Post
I would recommend having a licensed and competent electrical contractor do a load calculation on the upstairs apartment, re-wiring and adding circuits as necessary. That is you best bet with what is shown in those photos.
Two thoughts enter my head, neither of them good.

Either an unlicensed incompetent electrician installed this setup or a licensed but nonetheless incompetent electrician installed this setup. If it is the latter, how do you find a competent electrician? My state only requires them to be licensed.

That's clearly not a service panel, perhaps it belongs in a submarine? Might explain the yellow tape.

What happens when they want a third circuit? Haven't seen any triplex breakers yet - or maybe they can jump from the existing breaker to a second breaker to energize the other bus, and then put another duplex breaker in to provide the 2nd and 3rd circuit? That would probably be the best option fitting with the current setup.
Reply With Quote
HomeGauge Reports
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Determining age of breaker panel Jack Wingo Electrical Systems: Home Inspection and Commercial Inspection 3 08-29-2008 04:08 PM
Feed From Main Panel to Sub Panel Nick Ostrowski Electrical Systems: Home Inspection and Commercial Inspection 7 05-25-2008 06:38 PM
main panel Jerome W. Young Electrical Systems: Home Inspection and Commercial Inspection 7 01-04-2008 02:37 PM
Main service panel? Mark Muehleisen Electrical Systems: Home Inspection and Commercial Inspection 1 06-05-2007 01:09 PM
Main breaker rating RobertSmith Electrical Systems: Home Inspection and Commercial Inspection 4 06-01-2007 12:48 PM

Alabama | Alaska | Arizona | Atlanta | Aurora | Austin | Baltimore | Boston | California | Cambridge | Cape Coral | Chandler | Charlotte | Chicago | Cincinnati | Clarksville | Cleveland | Colorado | Columbus | Connecticut | Dallas | Delaware | Denver | Detroit | Durham | El Paso | Eugene | Florida | Fort Worth | Fresno | Georgia | Gilbert | Hawaii | Henderson | Houston | Huntsville | Idaho | Illinois | Indiana | Indianapolis | Irvine | Jacksonville | Joliet | Kansas City | Knoxville | Lancaster | Las Vegas | Los Angeles | Louisiana | Louisville | Maine | Maryland | Massachusetts | Memphis | Mesa | Miami | Michigan | Milwaukee | Minneapolis | Minnesota | Miramar | Mississippi | Missouri | Montana | Nashville | Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota | Oakland | Ohio | Oklahoma | Omaha | Ontario | Orange | Oregon | Orlando | Pennsylvania | Philadelphia | Phoenix | Pittsburgh | Plano | Portland | Port StLucie | Raleigh | Rhode Island | Roseville | Sacramento | Salem | San Antonio | San Diego | San Francisco | San Jose | Scottsdale | Seattle | Sioux falls | South Carolina | South Dakota | St Louis | Tampa | Tennessee | Texas | Thornton | Toledo | Tucson | Tulsa | Utah | Vancouver | Vermont | Virginia | West Virginia | Wichita | Wisconsin | Wyoming | Cost To Repair

All times are GMT -7. The time now is 09:22 PM.


Design by Vjacheslav Trushkin.
Powered by vBulletin® Version 3.6.5
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.0.0 RC8
vB.Sponsors
All Rights Reserved. Hann Tech Marketing Link / InspectionNews.com / InspectionNews.net - No part of InspectionNews.net may be reproduced in any way, or by any means, without the prior written permission of InspectionNews.net. Use of any index or listing Software for the purpose of constructing a mailing list, creating promotional materials or producing a printed or electronic catalog of any kind is expressly forbidden without the prior written permission of InspectionNews.net - All text, graphics and design on InspectionNews.net is copyright by Hann Tech Marketing Links.
Ad Management by RedTyger