Results 1 to 3 of 3

Thread: Terminolgy help

  1. #1
    dan orourke's Avatar
    dan orourke Guest

    Default Terminolgy help

    ...............

    Similar Threads:
    Last edited by dan orourke; 01-02-2008 at 08:55 AM.
    Inspection Referral

  2. #2
    Join Date
    Mar 2007
    Location
    Fletcher, NC
    Posts
    28,042

    Default Re: Terminolgy help

    As long as A (primary condensate line) the opening lower then B (secondary condensate line), then those are correct.

    The catch pan, which is what I called it years ago too, is the auxiliary condensate pan.

    I used to use the term 'secondary condensate pan', but that was confusing as the secondary condensate opening and secondary condensate drain line were not from that pan.

    Jerry Peck
    Construction/Litigation/Code Consultant - Retired
    www.AskCodeMan.com

  3. #3
    Join Date
    Mar 2007
    Location
    Fletcher, NC
    Posts
    28,042

    Default Re: Terminolgy help

    Quote Originally Posted by Jeff Eastman View Post
    Are the secondary drain lines (as shown in dans' arrow b) required by IRC/manufactures?
    Yes.

    Are the secondary drain lines required to be insulated in attic? I'd think so since the primary is required to be insulated.
    Yes.

    But not auxiliary pan drain lines.

    Jerry Peck
    Construction/Litigation/Code Consultant - Retired
    www.AskCodeMan.com

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •