You are currently viewing InspectionNews as a guest which gives you limited access to view most discussions but not pictures. There are over 6,300 inspectors who have already joined. By joining InspectionNews you will be able to see the pictures, have access to post topics, communicate privately with other members, respond to polls, upload content and access many other special features. Registration is fast and simple so please, join InspectionNews today!
If you have any problems with the registration process or your account login, please contact us.
Why join InspectionNews? Read the Testimonials
|
|

04-03-2007, 07:27 AM
|
|
Member
|
|
Join Date: Apr 2007
Location: Chicago
Posts: 39
|
|
|
High Efficiency Flue Termination
Greetings! I've been a long time reader, but now with the new website, I have been forced out of the shadows...That being said, I came across this situation on Sunday afternoon and could not find any material to say that it is wrong nor right.
PVC flue for a high efficiency furnace terminating through the roof instead of a sidewall. I've never seen that before. I check the HVAC code check book as well as some online resources and the only information regarding this points back to the original manufacturers instructions. It's a Carrier unit manufactured in May of 2002
|
|

04-03-2007, 07:33 AM
|
|
Member
|
|
Join Date: Mar 2007
Location: Philadelphia PA
Posts: 1,317
|
|
|
Re: High Efficiency Flue Termination
Nothing wrong with it going through the roof as opposed to horizontally through a wall as far as I know. Very common in these parts, usually with a bend at the top to keep out rain, but not always.
|
|

04-03-2007, 07:33 AM
|
|
Member
|
|
Join Date: Mar 2007
Location: Canandaigua New York
Posts: 131
|
|
|
Re: High Efficiency Flue Termination
Sean
The roof termination on most, if not all hight eff. furnaces allow both sidewall and roof terminations. Generaly when you see the roof termination it was installed when the house was being build, for they have open cavitys to run the pipe. The side wall venting is generally done on change out systems where the origional unit was a much lower eff. system. Hope this helps.
__________________
Well thats my 2 cents.
Brian Kelly
Kelly Home Inspections
|
|

04-03-2007, 07:38 AM
|
|
Member
|
|
Join Date: Apr 2007
Location: Chicago
Posts: 39
|
|
|
Re: High Efficiency Flue Termination
Thanks guys for your help. The major concern I had was the possibility of condensation collecting in the flue and with it being cold in these parts and possibly ice forming in the flue. Originally, I thought it was a plumbing vent which I know under most circumstances would be too tall.
Thanks again, I like this posting thing...I'm glad Brian forced me out of the inspection closet.
|
|

04-03-2007, 08:13 AM
|
 |
Member
|
|
Join Date: Mar 2007
Location: Spring Hill (Nashville), TN
Posts: 1,751
|
|
|
Re: High Efficiency Flue Termination
Originally Posted by Sean Bacon
Thanks guys for your help. The major concern I had was the possibility of condensation collecting in the flue and with it being cold in these parts and possibly ice forming in the flue. Originally, I thought it was a plumbing vent which I know under most circumstances would be too tall.
Thanks again, I like this posting thing...I'm glad Brian forced me out of the inspection closet.
As you are in an area with a good amount of snow and ice, I would recommend that they place an elbow on the end of the pipe so it is turned down. This will help to keep out snow, falling golf balls, etc.
Another thought is that PVC does not have any UV protection and after a few years that pipe will become brittle. Yes, it happens to even smaller vent stacks, its just that they are not as exposed. Spraying them with a protective paint will help to protect it and will also make it blend in better with the surrounding roof, that is if they use a paint to match the shingles!
|
|

04-03-2007, 10:41 AM
|
|
Member
|
|
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 7,643
|
|
|
Re: High Efficiency Flue Termination
What's that vent (exhaust?) just off to the left in the photo?
What kind of clearances are required between the exhaust from the high efficiency unit and a building opening?
|
|

04-03-2007, 11:57 AM
|
|
Member
|
|
Join Date: Mar 2007
Location: Canandaigua New York
Posts: 131
|
|
|
Re: High Efficiency Flue Termination
Before you go recomending the placement of an elbow on the top of the vent make sure the manufacture of the furnace allows that as not all manufactures advise or approve this. The water and snow that may fall down the pipe but the amount that does go down woll be taken care of by the furnace condensate removal system. Jerry does have a good point on the distance between both vents may not be proper.
__________________
Well thats my 2 cents.
Brian Kelly
Kelly Home Inspections
|
|

04-03-2007, 01:53 PM
|
|
Member
|
|
Join Date: Apr 2007
Location: Chicago
Posts: 39
|
|
|
Re: High Efficiency Flue Termination
In response to Jerry's question, that is presently the flue for the water heater (past for both earlier furnace and water heater). I don't see anything in the code check book that relates to clearance distances between to exhaust flues, though.
|
|

04-03-2007, 05:24 PM
|
 |
Member
|
|
Join Date: Mar 2007
Location: Barrington, IL
Posts: 396
|
|
|
Re: High Efficiency Flue Termination
The furnace discharge proximity to water heater vent is satisfactory.
As for PVC deterioration - never have seen it and many many soil stacks around here are PVC.
__________________
Eric Barker
Moraine Woods Consulting, Inc.
Barrington, IL
|
|
| Thread Tools |
Search this Thread |
|
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
| Thread |
Thread Starter |
Forum |
Replies |
Last Post |
| ABS Flue Pipe on LP Water Heater |
Trey Humphreys |
Plumbing System: Home Inspection and Commercial Inspection |
6 |
04-03-2007 02:11 PM |
All times are GMT -7. The time now is 11:11 AM.
| | |
|