Results 1 to 12 of 12
Thread: Counter flashing at chimney
-
07-17-2008, 05:13 PM #1
Counter flashing at chimney
I would like a second opinion on the short counter flashing. It seems to me that counter flashing should be longer and extend out over the top course or shingles.
Similar Threads:
-
07-17-2008, 06:16 PM #2
Re: Counter flashing at chimney
Although somewhat worn, the counter flashing looks OK.
Can you tell if the flashing is on top of the shingles or below them?
The nails I see on top of shingles are a No No.
' correct a wise man and you gain a friend... correct a fool and he'll bloody your nose'.
-
07-17-2008, 07:05 PM #3
Re: Counter flashing at chimney
From the picture the counter flashing looks a bit sloppy. You are right to question why flashing does not extend over the top course of shingles. It's probably safe to say that this was a non-professional application.
Eric Barker, ACI
Lake Barrington, IL
-
07-17-2008, 07:08 PM #4
Re: Counter flashing at chimney
Like most of those I find they put that short course of shingles over the flashing and tack it down thru the shingles to keep it down. Most of the time I see caulk over the nails. Obviously not correct but just a securing and visual thing.
-
07-17-2008, 07:16 PM #5
Re: Counter flashing at chimney
"Most of the time I see caulk over the nails"
I would rather see the shingles over the flashing not nailed, but adhered with roof cement.
' correct a wise man and you gain a friend... correct a fool and he'll bloody your nose'.
-
07-18-2008, 08:54 AM #6
Re: Counter flashing at chimney
You are correct. The flashing is wrong.
-
07-18-2008, 10:36 AM #7
Re: Counter flashing at chimney
The flashing is wrong. The bottom/counter/apron flashing should be on top of the last row of shingles. Homeowners complain they don't like the way it looks. All they want to see is their pretty shingles not 'that dark, ugly metal stuff'. I have no problem with a few shingles glued on top of the flashing for appearance. The second I see one nail through it though it's a defect.
-
07-18-2008, 02:23 PM #8
Re: Counter flashing at chimney
Depends on the roofing company. Some like exposed metal some like to cover it with a layer of shingles. The shingles would be under the apron metal but they install another course to cover the metal. Why would you call out a face nail if it's caulked. How else do you nail down the leading edge of the metal. As long as they are caulked it's not a problem. There are many areas that are faced nailed like a top of hip or the finish tab on the ridge. Just gluing the shingle down is not efficient. Eventually the sealant will fail and the shingle blow off.
The corner of the chimeny is wrong though. The step flashing should be on top of the notched shingle. In this instance the application of the apron and first piece of step flashing is wrong and should be corrected. If you look at the corners the water will run down the side and under the shingle from what I can see.
-
07-18-2008, 02:42 PM #9
-
07-18-2008, 02:51 PM #10
Re: Counter flashing at chimney
I can't say for sure if they used solarseal, butyl or some cheap latex caulk. Unless a place is in a high wind location I see no good reason to nail the end of the flashing to the roof if otherwise properly installed.
A good roofer can run a ridge or hip with only two nails caulked at the very last piece at the end. All others should be overlapped.
One of the big problems is too many guys who aren't properly trained doing roofs and leaving exposed nails all over the place. Each nail might be the next leak.
-
07-18-2008, 03:18 PM #11
Re: Counter flashing at chimney
I see no good reason to nail the end of the flashing to the roof if otherwise properly installed.
-
07-18-2008, 03:22 PM #12
Re: Counter flashing at chimney
And it will fail on other areas to, like the face nails. Exposed nails in hips and ridges are a weak point in the roof system.
Everything on the home needs maintenance and that includes the roof.