RS: Typical HVAC crew hack job. I would report the field alteration of the top plate as atypical and almost certainly not according to the original building plans, and require further investigation by a structural engineer.
-
11-19-2009, 01:57 PM #3
Re: Cut out
Ryan, I need more information on what I'm looking at before I follow A.D.'s lead and condemn it. I think I see the top of a basement wall with a air vent passing into a chase which may turn vertical. The chase needs to be fire-stopped at a minimum and I would need a longer establishing shot to observe the load paths before commenting on the carpentry.
-
11-19-2009, 08:13 PM #4
Re: Cut out
Any more thoughts on this cut out. Does anyone recommend reporting on it or just letting it go?
Thanks,
Ryan
-
11-20-2009, 07:05 AM #5
Re: Cut out
The TJI perpendicular to the wall needs a joist hanger.
-
11-20-2009, 08:24 AM #6
Re: Cut out
Definately report it. There are many ways to correct this defect. Let the client decide what to do next. Your observation, guidance on what to do is what the clients pay for . . .
"Cut / damaged floor/ceiling support structure present. Further evaluation and correction by a qualified contractor advised. (carpenter)
Just my opinion.
-
11-20-2009, 03:51 PM #7
Re: Cut out
It just needs a joist hanger. There is just one I joist cut and and the two joist on either side have bearing to the foundation wall. No need for an engineer, unless there is something on the other side of the wall we can't see. Gotta love the HVAC guys. They are handy with sawzall...