Results 1 to 3 of 3

Thread: CSST

  1. #1
    Join Date
    Apr 2012
    Location
    Maine
    Posts
    2

    Default CSST

    I have 8" thick SIPs for exterior walls. The CSST is connected directly to the stub out where it enters the wall from the exterior. The connection between the stub out and the CSST can not be seen because the stub out is not long enough. OK, now to my question: can the bonding clamp be mounted on the section of the stub out that is on the exterior of the house? There seems to be enough room between the regulator and the entry point into the house to do it. OR, does the gas company need to come back to extend the stub out so that the bonding clamp is on the interior?

    Thank you for your thoughts.

    Similar Threads:
    Inspection Referral

  2. #2
    Join Date
    Aug 2008
    Location
    Pleasant Hill, Iowa
    Posts
    145

    Default Re: CSST

    The bonding is to be installed on the exterior on the black iron pipe before it enters the house. The black iron is already bonded to the CSST as it is connected together.

    ***IMPORTANT*** You Need To Register To View Images ***IMPORTANT*** You Need To Register To View Images
    Dan Hagman ACI
    ProSite Home Inspections
    Des Moines, Iowa

  3. #3
    Join Date
    Apr 2012
    Location
    Maine
    Posts
    2

    Default Re: CSST

    Sorry, I should have mentioned that I use propane. The line from the tank to the house is buried. It comes out of the ground near the house and attaches to a regulator which is attached to the side of the house.


Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •