Results 1 to 3 of 3
  1. #1
    Join Date
    May 2017
    Location
    Kentucky
    Posts
    2

    Default Cold joint with void

    My friend just had a foundation pored and it has a void and a viable cold joint on both sides. The void goes clean to the other side it's about as big as your finger tips.the cold joint is really bad on the other side but no picture will this cause problem in the future?

    Similar Threads:
    ***IMPORTANT*** You Need To Register To View Images ***IMPORTANT*** You Need To Register To View Images
    Crawl Space Creeper

  2. #2
    Join Date
    Oct 2010
    Location
    MONTREAL QUEBEC-CANADA
    Posts
    2,075

    Default Re: Cold joint with void

    Pic please.
    For the most part a cold joint is the concrete pour of the foundation interrupted, by what every means.
    Where is the cold joint in relationship to the footing and grade?
    What do it look like?
    How long is the cold joint seam?

    Robert Young's Montreal Home Inspection Services Inc.
    Call (514) 489-1887 or (514) 441-3732
    Our Motto; Putting information where you need it most, "In your hands.”

  3. #3
    Join Date
    May 2017
    Location
    Kentucky
    Posts
    2

    Default Re: Cold joint with void

    It appears it will be above and below grade the void at the top will be above grade and runs at an angle it's about 8-10 foot long and runs from the footer to the top
    Quote Originally Posted by ROBERT YOUNG View Post
    Pic please.
    For the most part a cold joint is the concrete pour of the foundation interrupted, by what every means.
    Where is the cold joint in relationship to the footing and grade?
    What do it look like?
    How long is the cold joint seam?
    - - - Updated - - -

    Quote Originally Posted by ROBERT YOUNG View Post
    Pic please.
    For the most part a cold joint is the concrete pour of the foundation interrupted, by what every means.
    Where is the cold joint in relationship to the footing and grade?
    What do it look like?
    How long is the cold joint seam?
    It will be above and below grade is about 8-10 foot long and runs from the ground to the top with the void at the top


Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •