Results 1 to 2 of 2
  1. #1
    Dylan Shoop's Avatar
    Dylan Shoop Guest

    Default Problem? form board moved

    Two year old house. It appears the form board moved when the slab was poured. The brick is flush with slab at the back of the house and the ledge gets wider towards the front. About 2-3 inches. I've never seen this before and not sure how to report it and if this could be a potential problem later on. No evidence of any movement.

    Similar Threads:
    ***IMPORTANT*** You Need To Register To View Images ***IMPORTANT*** You Need To Register To View Images
    Crawl Space Creeper

  2. #2
    Join Date
    Mar 2007
    Location
    Fletcher, NC
    Posts
    28,042

    Default Re: Problem? form board moved

    Foundation or maybe just the brick ledge poured out-of-square, the mason laid up the brick square and true.

    As long as the through the wall flashing is installed, there should not be any problems.

    Jerry Peck
    Construction/Litigation/Code Consultant - Retired
    www.AskCodeMan.com

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •