InspectionNews - Home Inspection



Registration is FREE!... and will get rid of this top message

Welcome to InspectionNews.net.

You are currently viewing InspectionNews as a guest which gives you limited access to view some discussions but none of the pictures.

There are over 9,970 inspectors who have already joined. By joining InspectionNews you will be able to see the pictures, post new topics or reply to others, communicate privately with other members, respond to polls, upload content and access many other special features.

Registration is FREE for you because the sponsors pay your way. Please visit the sponsors often and let them know that you found them on InspectionNews!

Registration is FREE, fast and easy so please, join InspectionNews today!

Why join InspectionNews? Read the Testimonials

Looking for Education? We recommend Casey, O'Malley and Associates
Home and Commercial Inspection Education

If you have any problems with the registration process or your account login, please contact us.

Reply
 
LinkBack Thread Tools Search this Thread
  #1 (permalink)  
Old 05-11-2008, 12:12 PM
Aaron Miller
 
Posts: n/a
Sla-On-Grade Curing/Loading
I've lost my ACI reference to the amount of time that should transpire between placement of the concrete in a slab-on-grade foundation and loading or framing the struture on it. Any hints?

Thanks,

Aaron
Reply With Quote
F.I.R.E. provides fireplace education, consulting services, fire investigation and litigation support across the United States.
  #2 (permalink)  
Old 05-11-2008, 08:11 PM
Jerry Peck's Avatar
Jerry Peck Jerry Peck is online now
Member
 
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 14,280
Re: Sla-On-Grade Curing/Loading
Depends on the mix and the admixtures, if any.

In South Florida, if the right mix was used, they were allowed to stack block on the slab after just 12 hours. The easiest way to accomplish that, if you need 2500 psi concrete, would be to place 7000 psi mix concrete, that's probably 3500 psi in 12 hours.

That said, once, in Gainesville, Florida, they (local contractors all got together and coordinate this) constructed a stick built house in 11 hours, *INCLUDING* placing the steel and pouring the concrete - that concrete was curing almost faster than it could be placed, and you had almost zero time to screed it, float it, and trowel it before it was too stiff (hard) to do anything with ... had to, because the walls were being set on it before the concrete finishers were done. Remember, only 11 hours to completion of the home.
__________________
Jerry Peck, Construction / Litigation Consultant
Construction Litigation Consultants, LLC ( www.ConstructionLitigationConsultants.com )
www.AskCodeMan.com
Reply With Quote
  #3 (permalink)  
Old 05-12-2008, 03:18 AM
Aaron Miller
 
Posts: n/a
Re: Sla-On-Grade Curing/Loading
ECJ:

I understand that the mix can be adjusted for exceptional circumstances, but for a standard 3500 psi mix 24 hours is not long enough. Agreed?

Aaron
Reply With Quote
  #4 (permalink)  
Old 05-12-2008, 06:50 AM
bruce m graham III bruce m graham III is offline
Member
 
Join Date: Apr 2007
Location: gainesville fl
Posts: 103
Re: Sla-On-Grade Curing/Loading
Jerry,
Do you remeber the address?
Reply With Quote
  #5 (permalink)  
Old 05-12-2008, 07:10 AM
Jerry Peck's Avatar
Jerry Peck Jerry Peck is online now
Member
 
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 14,280
Re: Sla-On-Grade Curing/Loading
Quote:
Originally Posted by Aaron Miller View Post
I understand that the mix can be adjusted for exceptional circumstances, but for a standard 3500 psi mix 24 hours is not long enough. Agreed?
Aaron,

Define "standard" 3500 mix".

You can order a "standard 3500 mix" which is "high early strength", 12 hours might be long enough for that.

You would need to find the mix and if it was high early strength or not (that is a "standard mix"), and, if not, and if there was nothing else in there, 24 hours 'might not be' long enough - but I'm not a an ACI concrete guy, so I don't know. All I know is that wherever I've been, "the standard" has allowed for loading block after 12 hours, probably because they are all using 'high early strength' concrete.
__________________
Jerry Peck, Construction / Litigation Consultant
Construction Litigation Consultants, LLC ( www.ConstructionLitigationConsultants.com )
www.AskCodeMan.com
Reply With Quote
  #6 (permalink)  
Old 05-12-2008, 07:29 AM
Jerry Peck's Avatar
Jerry Peck Jerry Peck is online now
Member
 
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 14,280
Re: Sla-On-Grade Curing/Loading
Bruce,

No, don't remember the address, but, as I recall, it was in the SW section (which was not as big back then as it is now - that was 30 years ago).

That was at about the same time that a company in Texas (Dallas?) built a house in a mall/convention center as a promotion, raffled off the house, then took it down and re-constructed it on another lot. I believe it was 2 days to build, up for 5 days, 2 days to take it down, and another 2 days to put it back together. Not real sure of the time I have down for those, other than I remember for sure that it was only up for 5 days in the mall/convention center.
__________________
Jerry Peck, Construction / Litigation Consultant
Construction Litigation Consultants, LLC ( www.ConstructionLitigationConsultants.com )
www.AskCodeMan.com
Reply With Quote
  #7 (permalink)  
Old 05-12-2008, 10:25 AM
BARRY ADAIR's Avatar
BARRY ADAIR BARRY ADAIR is offline
Member
 
Join Date: Mar 2007
Location: Land of Gar, TX
Posts: 418
Re: Sla-On-Grade Curing/Loading
Aaron,

Not exactly the info requested but this does make mention about cure time.

http://www.icc-es.org/reports/pdf_files/UBC/1290.pdf

I don't think this would be much different for the hand-driven cut nails we see.
__________________
badair http://www.adairinspection.com Garland, TX 75042
Residential-Commercial-Construction-EIFS-Infrared Thermography
life is the random lottery of events followed by numerous narrow escapes
Reply With Quote
  #8 (permalink)  
Old 05-12-2008, 11:02 AM
Aaron Miller
 
Posts: n/a
Re: Sla-On-Grade Curing/Loading
Barry:

I think that will do nicely. Though not exactly what I was after it lends itself to spin . . .

Thanks,

Aaron
Reply With Quote
  #9 (permalink)  
Old 05-12-2008, 08:46 PM
Jerry Peck's Avatar
Jerry Peck Jerry Peck is online now
Member
 
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 14,280
Re: Sla-On-Grade Curing/Loading
That has nothing to do with loading block on a slab, it only has to do with installing anchors into the concrete (two completely different issues and concerns).

Besides, it says the same thing I've been saying ... it depends on the strength of the concrete, not the curing time!

4.5 Fasteners are installed in normal-weight concrete that has cured a minimum of seven days OR HAS REACHED a minimum ultimate compressive strength of 2,000 pounds per square inch (13.8 MPa).


Aaron, I know you are good at spinning things, but, first you need to know what the strength of that concrete is, and *I* would *NOT* use this for fastener pullout to relate anything to loading concrete block on a slab.

__________________
Jerry Peck, Construction / Litigation Consultant
Construction Litigation Consultants, LLC ( www.ConstructionLitigationConsultants.com )
www.AskCodeMan.com
Reply With Quote
  #10 (permalink)  
Old 05-13-2008, 04:43 AM
Aaron Miller
 
Posts: n/a
Re: Slab-On-Grade Curing/Loading
ECJ:

Don't worry about the concrete block. We only use that here for building BBQs.

The problem here lies in the fact that there is no paperwork relating to the exact mix used, ad-mixes, water added, etc. We can only go by a rebound hammer test (5500 psi) now that the slab has cured. That will not tell us with any degree of accuracy what the original mix was.

As with most residential (and some commercial) slabs-on-grade here there is little or no oversight. The correct preparation for and placement of the concrete is always left to the discretion of Juan y Jose. No engineers watch over their designs as they are implemented. Few municipal inspectors even walk the site prior to pour, much less do they stand there while it is being poured. No paperwork is required to be provided. It is a GD free-for-all.

The builder poured this slab and was planning to go full steam ahead with framing on it the next day. I doubt like hell that the compressive strength would have reached 2000 psi by then. I know you were touting high-strength mixtures, but these are expensive and never used on residential work here. They are mostly for TX DOT for when they need to load a road in less than three days.

Any suggestions now that I have provided more pieces to the puzzle?

Thanks,

Aaron
Reply With Quote
  #11 (permalink)  
Old 05-13-2008, 07:09 AM
Jerry Peck's Avatar
Jerry Peck Jerry Peck is online now
Member
 
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 14,280
Re: Slab-On-Grade Curing/Loading
Quote:
Originally Posted by Aaron Miller View Post
the amount of time that should transpire between placement of the concrete in a slab-on-grade foundation and loading or framing the struture on it.
I was keying in on the loading part of your question, however, I think you are asking more of the framing part of it.

Quote:
Originally Posted by Aaron Miller View Post
Don't worry about the concrete block. We only use that here for building BBQs.
Okay, so it must be frame, either wood or metal framing.

Quote:
The builder poured this slab and was planning to go full steam ahead with framing on it the next day. I doubt like hell that the compressive strength would have reached 2000 psi by then.
That part, for the framing, is where the ICC report Barry provided comes in - if they are using those Hilti fasteners.

Find out what fasteners are being used and then address through the manufacturer.

In the case of those Hilti fasteners, they require the concrete be cured to 2,000 psi minimum - so have the builder provide proof of that. Have him take a core sample and have it break tested, if it meets 2,000 psi, go for it, if not, wait until it does meet 2,000 psi at a break test.

Or.

Wait 7 days, then, regardless of what it has cured to (OMG ... but that what it says), then go for it.
__________________
Jerry Peck, Construction / Litigation Consultant
Construction Litigation Consultants, LLC ( www.ConstructionLitigationConsultants.com )
www.AskCodeMan.com
Reply With Quote
  #12 (permalink)  
Old 05-13-2008, 09:26 AM
Aaron Miller
 
Posts: n/a
Re: Slab-On-Grade Curing/Loading
Quote:
In the case of those Hilti fasteners, they require the concrete be cured to 2,000 psi minimum - so have the builder provide proof of that. Have him take a core sample and have it break tested, if it meets 2,000 psi, go for it, if not, wait until it does meet 2,000 psi at a break test.
ECJ:

That's what I was saying. The slab was poured in August of last year. I stopped the builder from framing the next day. He could produce no satisfactory docs then, and will not be able to now. So, the Hilti ICC-ES doc will give me the leverage I need. He cannot show that the slab had reached the necessary hardness by the following day.

Spin-spin-spin-spin . . . . .


Aaron
Reply With Quote
  #13 (permalink)  
Old 05-13-2008, 10:30 AM
Jerry Peck's Avatar
Jerry Peck Jerry Peck is online now
Member
 
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 14,280
Re: Slab-On-Grade Curing/Loading
Quote:
Originally Posted by Aaron Miller View Post
The slab was poured in August of last year. I stopped the builder from framing the next day.
Surely, though, it is cured by now?

Quote:
He could produce no satisfactory docs then, and will not be able to now. So, the Hilti ICC-ES doc will give me the leverage I need. He cannot show that the slab had reached the necessary hardness by the following day.

Spin-spin-spin-spin . . . . .
Aaron,

No spin cycle required for that document, simply wash, dry, fold.
__________________
Jerry Peck, Construction / Litigation Consultant
Construction Litigation Consultants, LLC ( www.ConstructionLitigationConsultants.com )
www.AskCodeMan.com
Reply With Quote
  #14 (permalink)  
Old 05-19-2008, 06:13 PM
Rolland Pruner Rolland Pruner is offline
Member
 
Join Date: Mar 2007
Posts: 50
Re: Sla-On-Grade Curing/Loading
This would be the soil engineers decision at the time of construction.
Depends on soil conditions.

Rolland Pruner
Livermore, Calif
Reply With Quote
HomeGauge Reports
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Temporary Loading Document Aaron Miller Building Interior: Home Inspection and Commercial Inspection 0 04-14-2008 02:03 PM
curing ADD (Attention Deficit Disorder) the old way Jerry Peck General Chit Chat: Home Inspectors & Commercial Inspectors 0 10-06-2007 08:34 AM
Slab-on-Grade Engineering Required? Aaron Miller Sub-Structure: Home Inspection and Commercial Inspection 4 09-30-2007 10:51 AM
Slab-on-Grade Aaron Miller Sub-Structure: Home Inspection and Commercial Inspection 11 09-28-2007 05:35 PM
Trouble Loading InspectionNews Pages Brian Hannigan General Chit Chat: Home Inspectors & Commercial Inspectors 22 09-09-2007 10:25 AM

Alabama | Alaska | Arizona | Atlanta | Aurora | Austin | Baltimore | Boston | California | Cambridge | Cape Coral | Chandler | Charlotte | Chicago | Cincinnati | Clarksville | Cleveland | Colorado | Columbus | Connecticut | Dallas | Delaware | Denver | Detroit | Durham | El Paso | Eugene | Florida | Fort Worth | Fresno | Georgia | Gilbert | Hawaii | Henderson | Houston | Huntsville | Idaho | Illinois | Indiana | Indianapolis | Irvine | Jacksonville | Joliet | Kansas City | Knoxville | Lancaster | Las Vegas | Los Angeles | Louisiana | Louisville | Maine | Maryland | Massachusetts | Memphis | Mesa | Miami | Michigan | Milwaukee | Minneapolis | Minnesota | Miramar | Mississippi | Missouri | Montana | Nashville | Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota | Oakland | Ohio | Oklahoma | Omaha | Ontario | Orange | Oregon | Orlando | Pennsylvania | Philadelphia | Phoenix | Pittsburgh | Plano | Portland | Port StLucie | Raleigh | Rhode Island | Roseville | Sacramento | Salem | San Antonio | San Diego | San Francisco | San Jose | Scottsdale | Seattle | Sioux falls | South Carolina | South Dakota | St Louis | Tampa | Tennessee | Texas | Thornton | Toledo | Tucson | Tulsa | Utah | Vancouver | Vermont | Virginia | West Virginia | Wichita | Wisconsin | Wyoming | Cost To Repair

All times are GMT -7. The time now is 04:49 PM.


Design by Vjacheslav Trushkin.
Powered by vBulletin® Version 3.6.5
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.0.0 RC8
vB.Sponsors
All Rights Reserved. Hann Tech Marketing Link / InspectionNews.com / InspectionNews.net - No part of InspectionNews.net may be reproduced in any way, or by any means, without the prior written permission of InspectionNews.net. Use of any index or listing Software for the purpose of constructing a mailing list, creating promotional materials or producing a printed or electronic catalog of any kind is expressly forbidden without the prior written permission of InspectionNews.net - All text, graphics and design on InspectionNews.net is copyright by Hann Tech Marketing Links.
Ad Management by RedTyger