InspectionNews - Home Inspection



Welcome to InspectionNews.

Registration is FREE!

Why join InspectionNews? Read the Testimonials

You are currently viewing InspectionNews as a guest which gives you limited access to view some discussions but you will not see any of the pictures or technical bulletins that have been uploaded.

There are over 11,850 inspectors who have already joined InspectionNews, contributing over 100,700 posts. By joining InspectionNews you will be able to see the pictures, start new threads, reply to posts, communicate privately with other members, respond to polls, upload content and access many other special features.

If you are an inspector or thinking about becoming one, InspectionNews is the place for you.

Registration is FREE because the sponsors pay your way.
Please visit all the sponsors often and let them know that you found them on InspectionNews!

How much should an inspection cost? Click the banner below to find out.
The Cost Of Business

If you have any problems with the registration process or your account login, please contact us.

Registration is easy, so please Join InspectionNews Today!

Reply
 
LinkBack Thread Tools Search this Thread
  #1 (permalink)  
Old 06-05-2008, 05:50 AM
Greg Jenkins Greg Jenkins is offline
Member
 
Join Date: Mar 2007
Location: Charleston, WV
Posts: 62
Block foundation transition
I am looking for some detailed info. on the correct method to transition from one block size to the next when constructing a foundation wall. In the posted picture it appears that the block is being reduced from a 12" to a 8". Should the cavity on the top course of the larger block be grouted?
I have not been able to find any details in my construction books.
Attached Images
File Type: jpg DSCN5953.JPG (111.2 KB, 33 views)
__________________
Greg Jenkins
Reply With Quote
Casey, O'Malley & Associates Home and Commercial Education Classes and Conferences
  #2 (permalink)  
Old 06-05-2008, 10:10 AM
Brandon Chew Brandon Chew is offline
Member
 
Join Date: Mar 2007
Location: Albany, NY
Posts: 301
Re: Block foundation transition
I don't have a reference handy for this. This is how I've seen it done.

The top course of the larger block should be either solid or grout-filled CMUs to provide a proper bearing surface for the smaller block. Grout-filled CMUs would be used if the wall needed to have rebar running vertically through the cores to tie it together. The exterior of the wall should be flush and the step should be on the interior side of the wall. This is so that the waterproofing/dampproofing can be done properly on the exterior side of the wall.
Reply With Quote
  #3 (permalink)  
Old 06-05-2008, 11:11 AM
Greg Jenkins Greg Jenkins is offline
Member
 
Join Date: Mar 2007
Location: Charleston, WV
Posts: 62
Re: Block foundation transition
That is the way "most" of this foundation was constructed. Most of the blocks were grout filled with the exception of a few. (see picture) It is though they ran out of grout and called it a day. Some horizontal rebar was visible when I looked into the block cavity.
__________________
Greg Jenkins
Reply With Quote
  #4 (permalink)  
Old 06-05-2008, 06:24 PM
Jerry Peck's Avatar
Jerry Peck Jerry Peck is online now
Member
 
Join Date: Mar 2007
Location: Ormond Beach, Florida
Posts: 15,407
Re: Block foundation transition
First, ACI 530 requires that face shells be fully bedded. That is not possible unless that course of the larger block is fully grouted or solid.

Second, there is a steel rebar in there, so I suspect it was intended to be grouted, but they probably ran out of grout, said ' I'll get it when the next truck comes for the lintels. ' and promptly forgot about it.

The only thing supporting the face shells of the smaller block are the webs for the larger block, and that ain't good at all.
__________________
Jerry Peck, Construction / Litigation Consultant
Construction Litigation Consultants, LLC ( www.ConstructionLitigationConsultants.com )
www.AskCodeMan.com
Reply With Quote
Home Inspector Essentials. The BEST prices for inspection tools.
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
City sidewalk to front walkway transition Matt Fellman Exterior Systems: Home Inspection and Commercial Inspection 9 06-01-2008 01:36 PM
Opinions on block wall foundation Stan Vaughn Sub-Structure: Home Inspection and Commercial Inspection 7 05-12-2008 06:35 AM
Roof transition Dave Gilstrap Roofing System: Home Inspection and Commercial Inspection 10 04-08-2008 02:53 PM
flat to pitch transition Jerome W. Young Roofing System: Home Inspection and Commercial Inspection 15 02-26-2008 12:49 PM
Superior CF4360 Gap at Smoke Chamber/Piping Transition Bart Ogden Fireplaces, Chimneys and Solid Fuel Burning Appliances: Home Inspection and Commercial Inspection 3 02-24-2008 02:52 PM

Alabama | Alaska | Arizona | Atlanta | Aurora | Austin | Baltimore | Boston | California | Cambridge | Cape Coral | Chandler | Charlotte | Chicago | Cincinnati | Clarksville | Cleveland | Colorado | Columbus | Connecticut | Dallas | Delaware | Denver | Detroit | Durham | El Paso | Eugene | Florida | Fort Worth | Fresno | Georgia | Gilbert | Hawaii | Henderson | Houston | Huntsville | Idaho | Illinois | Indiana | Indianapolis | Irvine | Jacksonville | Joliet | Kansas City | Knoxville | Lancaster | Las Vegas | Los Angeles | Louisiana | Louisville | Maine | Maryland | Massachusetts | Memphis | Mesa | Miami | Michigan | Milwaukee | Minneapolis | Minnesota | Miramar | Mississippi | Missouri | Montana | Nashville | Nebraska | Nevada | New Hampshire | New Jersey | New Mexico | New York | North Carolina | North Dakota | Oakland | Ohio | Oklahoma | Omaha | Ontario | Orange | Oregon | Orlando | Pennsylvania | Philadelphia | Phoenix | Pittsburgh | Plano | Portland | Port StLucie | Raleigh | Rhode Island | Roseville | Sacramento | Salem | San Antonio | San Diego | San Francisco | San Jose | Scottsdale | Seattle | Sioux falls | South Carolina | South Dakota | St Louis | Tampa | Tennessee | Texas | Thornton | Toledo | Tucson | Tulsa | Utah | Vancouver | Vermont | Virginia | West Virginia | Wichita | Wisconsin | Wyoming | Cost To Repair

All times are GMT -7. The time now is 06:46 PM.


Design by Vjacheslav Trushkin.
Powered by vBulletin® Version 3.6.5
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.0.0 RC8
vB.Sponsors
All Rights Reserved. Hann Tech Marketing Link / InspectionNews.com / InspectionNews.net - No part of InspectionNews.net may be reproduced in any way, or by any means, without the prior written permission of InspectionNews.net. Use of any index or listing Software for the purpose of constructing a mailing list, creating promotional materials or producing a printed or electronic catalog of any kind is expressly forbidden without the prior written permission of InspectionNews.net - All text, graphics and design on InspectionNews.net is copyright by Hann Tech Marketing Links.
Ad Management by RedTyger